Welcome Dave, I assume the exterior block wall is where the 3" or 4" existing plumbing drain is exiting to the septic tank. This is probably 2' or so below the exterior grade.
To add any extra plumbing to the basement you are going to have to add a sewage ejector which connects to the main drain up near the ceiling, plus a 2" vent up to the attic to tie into the existing main roof vent.
Is this what your asking?
_________________________
Randall