I know what you're saying.If I didn't know how to float mud,there'd be a lot of jobs that I'd have to run away from or do it and it would look like crap.
The last one,the framing was so bad for the shower walls and ceiling that I just decided to mud it.Didn't get paid extra for it but it sure made it a breeze to set the tiles.Probably took me 10 hours longer than if I just used CBU,the prep work anyway.
I really enjoy the mudwork if I get paid a lot for it.
