Ceramic tile installation tips - Renovations using Ceramic tile or Stone
Maximum Span Calculator for Joists
Maximum Span Calculator
Sponsored Links
Post Your Photos!
Volcano Travertine Walk-in Shower with Glass Block
bamboo porcelain
travertine shower w/ glass mosaic inlay
final pics of marble shower and bath
Marble shower/bath
Search

Page 2 of 2 < 1 2
Topic Options
#14701 - 10/04/09 11:14 AM Re: A few shower pan questions... [Re: JackOfAllTrades]
RC Offline
Senior Member

Registered: 10/21/03
Posts: 1797
Loc: Ontario, Canada
If it hasn't done it by now then your probably ok to continue on.

Quote:
I did NOT put down my actual moisture barrier shower liner yet, as obviously that goes on top of this layer. It would serve no good to go UNDER this first layer!


Your absolutely right, but you would not believe how many are actually done that way.
We just want to make sure, so you don't end up creating a big problem down the road.
_________________________
Randall

Top
#14776 - 10/24/09 11:37 AM Re: A few shower pan questions... [Re: JackOfAllTrades]
mdog Offline
New Member

Registered: 07/02/09
Posts: 10
Originally Posted By: JackOfAllTrades

.. I'm in a hurry because of the rain, so I mix it, and start to throw it in buckets to haul up to the shower...

It obviously depends on available space, but when I did my shower pan, I brought the cement and sand bags upstairs and mixed everything right next to the future shower. Oh, and no problems using a black mixing tray from HD, it survided 3 or 4 mixes no problem.

Top
#15405 - 02/09/10 09:47 PM Re: A few shower pan questions... [Re: JackOfAllTrades]
alansievewright Offline
New Member

Registered: 02/09/10
Posts: 4
Loc: tottenham ontario
just doing the same job as you are right now, for the first time. Basically just followed the steps in the site you mentioned and so far its been going ok. just put down my membrane tonight over the first sloped layer of mortar, found it awkward around the kirb to get it looking properly but after a while it looks ok, I think i will leave it overnight then fill the membrane with water, just to check for leaks around the drain before putting in my top coat of mortar. good luck with your project

Top
Page 2 of 2 < 1 2


May
Su M Tu W Th F Sa
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
Newest Members
yes123, Curt, joke, keys, eliav
3463 Registered Users
(Views)Popular Topics
Where do I begin... 61225
Kerdi Board 39705
Installing Nu Heat on Cement Slab 26056
Kerdi over Denshield 20993
Help with preslope!! 20556
Self-leveling compound on plywood 18554
slate tile on heated floor 16200
best liquid waterproofing? 14969
Ted's Shower 14236
New here, new to tile, and i have a new project. 13906
Forum Stats
3463 Members
16 Forums
3502 Topics
17306 Posts

Max Online: 556 @ 05/14/12 10:04 PM
Who's Online
2 registered (yes123, 1 invisible), 257 Guests and 1 Spider online.
Key: Admin, Global Mod, Mod
RSS Feed
Subscribe to our RSS Feed

Home    Forum     Technical Info     Our Service     Photo Gallery     Installation    Contact Us    Privacy     Links    Books